LogoGIRDER
Quote
Sheet S-0.1 — Cover
Girder Structural Engineering, PLLC

We make it
stand.

PE-stamped structural drawings for cantilevers that push limits, banks that need numbers, and contractors who need answers before the concrete truck arrives.

Scroll to explore
847Projects Stamped
24hrQuote Turnaround
0Unanswered RFIs
18States Licensed
02 — Projects
Selected Work, 2021–2026
Looking up through steel rebar cage and formwork on a residential tower construction site, geometric grid pattern visible against bright sky
Fig. 01 — Level 14 Rebar Cage, Looking Up
01
Residential High-Rise

The Meridian Residences

Chicago, IL

Floors

22

Max Span

32'-6"

Cantilever

14'-0"

Live Load

80 psf

— Challenge

Architect required 14-foot cantilever balconies on every residential floor with no visible support structure.

— Solution

Post-tensioned concrete slab with embedded PT anchors, eliminating visible beams while meeting IBC deflection limits.

View Calculations
Wide-angle view looking up through steel beam connections and corrugated metal deck during commercial building construction, blue sky visible through the structural grid
Fig. 02 — Transfer Beam, Level 3 Looking Up
02
Commercial + Residential

Fulton Market Mixed-Use

Chicago, IL

Floors

8 + Parking

Transfer Beam

W36×232

Column Load

1,840 kips

Soil Bearing

4,000 psf

— Challenge

Retail-to-residential transition required eliminating four columns between floors 2 and 3 for open-plan retail.

— Solution

W36×232 transfer beam spanning 48 feet, designed for 1,840 kip point load with full composite action.

View Calculations
Looking up from inside a deep foundation excavation showing reinforced concrete pile cap forms, heavy rebar mat, and construction equipment silhouetted against overcast sky
Fig. 03 — Mat Foundation, 18ft Excavation
03
Industrial Foundation

Calumet Cold Storage

Hammond, IN

Mat Depth

18'-0"

Pile Count

312 HP14×89

Total Load

42,000 kips

Frost Depth

48"

— Challenge

Variable fill soil to 22 feet, adjacent railroad surcharge, and a 12-week permit window before ground freeze.

— Solution

Deep HP14×89 pile system with 3-foot mat slab, designed around railroad surcharge envelope and expedited permit drawings.

View Calculations
03 — Get a Quote

Your quote
in 24 hours.

Three fields. One business day. Stamped drawings, fixed fee, and a structural engineer who picks up the phone.

Fixed-fee pricing — no hourly surprises
PE stamp in all 50 states via reciprocity
24-hour RFI response, guaranteed
Bank-ready stamped calculations

Not ready to submit?

“Stamped drawings. Fixed fee. No RFIs left unanswered.”

04 — The Girder StandardWhy Engineers Choose Girder

The structure
behind the work.

Every project that lands on our desk gets a licensed PE, not a junior drafter. Every stamp is earned, not rubber-stamped.

Stamped in Every State

Licensed PEs in 18 states with reciprocity coverage nationwide. Your bank, your AHJ, your building department — all satisfied.

24-Hour RFI Response

We commit to a 24-hour turnaround on every RFI. Not a ticket number — an actual answer from the engineer who stamped the drawings.

Fixed-Fee Pricing

Scope-based fees quoted upfront. No hourly billing, no change orders for scope creep, no surprises at invoice.

Load Path Clarity

Every drawing includes annotated load paths. Your contractor sees exactly where the forces go — no ambiguity, no substitutions.

Structural engineer reviewing large-format construction drawings spread across a steel drafting table, technical annotations visible in graphite pencil
Fig. 04 — Drawing Review
Close-up of structural steel beam connection with high-strength bolts and steel plates, industrial construction detail
Fig. 05 — Connection Detail
Looking up at concrete formwork and shoring system inside a commercial building under construction, geometric pattern of wood and steel
Fig. 06 — Formwork
05 — Voices From The FieldArchitects · Developers · Contractors
Looking up through steel rebar cage on construction site, geometric grid pattern against sky
Meridian Residences, Level 14
Wide-angle view looking up through steel beam connections and corrugated metal deck during construction
Fulton Market, Transfer Level
Looking down into a deep foundation excavation showing reinforced concrete pile cap forms and heavy rebar mat
Calumet Foundation, Mat Slab

Meridian Residences — Chicago, IL

"The cantilever calcs came back in 18 hours."The stamp was on the drawings before my client even asked if we'd heard back. That's the kind of firm you want on the project team.

"The bank released the draw on schedule."We needed stamped calculations before the bank would release the construction draw. Girder had the package to our lender in under 24 hours. The draw closed on schedule.

"The engineer called me back in four minutes."Six a.m. on the slab, the concrete truck is idling, and I've got a question about the pour sequence. I texted the number on the drawings.

Marcus Okafor

Principal ArchitectOkafor Atelier, Chicago